LOCATION | EDT Ifestos Floating Dock & Alongside | |
DURATION | 7 months: Oct. 2017 – Apr. 2018 | |
BARGE PROVIDED | Non Propelled Flat Deck Barge EDT Regas | |
ASSETS PROVIDED |
|
|
SERVICES PROVIDED | Within 7 months, Ifestos Marine Works successfully Designed, Engineered & Installed a Class Approved, CAP 437 Compliant Helideck on the aft deck of a vessel with provisions for installing a permanent refuelling system at a later date. In parallel to this major project deliverable, a complete AC Refit was undertaken along with main engines overhauls.
The project was successfully delivered ahead of time and under budget. |